Process gas analyser shelter for Bozoy CS-1
GAS ANALYSIS
Scope of work
In 2024–2025, work for Beineu-Shymkent Gas Pipeline LLP at the Bozoy CS-1 compressor station covered a process gas analyser shelter and its integration with the existing SCADA system.
- Customer
- Beineu-Shymkent Gas Pipeline LLP
- Facility
- Bozoy CS-1 compressor station
- Execution period
- 2024–2025
- Design of the process gas analyser shelter.
- Manufacture of the shelter.
- Installation and commissioning.
- Integration with the existing SCADA system.